Certified Project Manager (IAPM) Exam - Quiz 06 - Nusrat Jahan - PMPQB - batch14062024
Quiz-summary
0 of 30 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
Information
Certified Project Manager (IAPM) Exam Topics Cover:
Definition and characteristics of a project
The role of a project manager
Project management frameworks and methodologies (e.g., Waterfall, Agile, PRINCE2)
Project selection and prioritization
Developing a project charter
Identifying stakeholders and establishing stakeholder management strategies
Setting project objectives and scope
Work breakdown structure (WBS) creation
Developing project schedules using Gantt charts and network diagrams
Resource planning and allocation
Risk management planning, including risk identification, analysis, and mitigation strategies
Quality planning and setting quality standards
Communication planning and stakeholder engagement strategies
Managing project teams and conflict resolution
Directing and managing project work
Implementing quality assurance processes
Conducting procurements and managing contracts
Ensuring effective communication and information distribution
Performance measurement and tracking (using KPIs and performance indices)
Earned value management (EVM) for project performance analysis
Schedule control and variance analysis
Cost control and budget management
Quality control processes and techniques
Risk monitoring and control, updating risk registers
Managing changes through a change control process
Ensuring stakeholder engagement and addressing stakeholder concerns
Closing project phases and finalizing all project activities
Administrative closure processes
Post-project evaluations and lessons learned
Creating and distributing a final project report
Transitioning project deliverables to operations or next phases
Program and portfolio management
Managing multiple projects (multi-project management)
Project governance frameworks
Strategic alignment of projects with organizational goals
International project management and managing global teams
Project management in different sectors (IT, construction, healthcare, etc.)
Project management software and tools (e.g., MS Project, Jira, Trello)
Techniques for effective problem-solving and decision-making
Analytical tools for risk and performance analysis
Techniques for stakeholder analysis and engagement
Methods for facilitating effective meetings and workshops
Leadership and team management
Communication skills and active listening
Negotiation and conflict resolution
Time management and personal productivity
Critical thinking and decision-making skills
Ethical considerations and professional responsibility
Differentiate projects from ongoing operations.
Characteristics such as unique objectives, defined beginning and end, and resources constraints.
Initiation, planning, execution, monitoring and controlling, and closure.
Tailoring phases to project types (e.g., software development, construction).
Responsibilities in leadership, communication, and stakeholder management.
Balancing constraints (scope, schedule, cost) while achieving project objectives.
Overview of Waterfall, Agile, Scrum, Kanban, PRINCE2, and PMBOK.
Choosing methodologies based on project characteristics and organizational culture.
Techniques like benefit-cost analysis, weighted scoring, and strategic alignment.
Criteria for selecting projects aligned with organizational goals.
Contents: project purpose, objectives, scope, stakeholders, and high-level risks.
Approval and communication processes.
Identifying Stakeholders and Establishing Management Strategies:
Techniques for stakeholder analysis (power/interest grid, influence/impact grid).
Strategies for managing stakeholder expectations and engagement.
SMART criteria (Specific, Measurable, Achievable, Relevant, Time-bound).
Scope definition, including inclusions and exclusions.
Hierarchical decomposition of project deliverables and work packages.
WBS dictionary detailing scope, responsibilities, and deliverables.
Gantt charts, network diagrams (PERT/CPM), milestone charts.
Critical path analysis and schedule compression techniques.
Resource requirements and availability.
Resource leveling and resource smoothing techniques.
Cost types (direct, indirect, fixed, variable).
Techniques: analogous, parametric, bottom-up estimation.
Risk management processes: identification, analysis, response planning, and monitoring.
Risk categories (technical, organizational, external) and prioritization techniques.
Quality management processes and standards (ISO, Six Sigma).
Techniques: quality metrics, quality audits, process improvement methodologies.
Stakeholder communication requirements and channels.
Communication management plan: frequency, format, and stakeholders’ preferences.
Team development stages (forming, storming, norming, performing, adjourning).
Leadership styles (transformational, transactional, servant leadership).
Motivation theories (Maslow’s hierarchy, Herzberg’s two-factor theory).
Work authorization systems and project kickoff meetings.
Managing changes and addressing issues and conflicts.
Quality control vs. quality assurance.
Techniques for quality assurance (inspections, peer reviews, process analysis).
Procurement processes: planning, solicitation, source selection, contract administration.
Types of contracts (fixed-price, cost-reimbursable, time and material).
Communication barriers and strategies for overcoming them.
Techniques for effective meetings, presentations, and written communication.
Key Performance Indicators (KPIs) and performance indices.
Earned Value Management (EVM) and its components (PV, EV, AC, CPI, SPI).
Variance analysis and corrective actions.
Schedule performance measurements (SV, CV, SV%, CV%).
Schedule compression and schedule crashing techniques.
Cost performance measurements (CV, CPI).
Forecasting techniques (ETC, EAC) and cost variance analysis.
Monitoring residual risks and secondary risks.
Evaluating risk responses and updating risk registers.
Change management procedures (change request, impact analysis, change control board).
Configuration management and version control.
Strategies for managing stakeholder expectations and communication.
Addressing stakeholder concerns and conflicts.
Administrative closure processes (finalizing project deliverables, documentation, and contracts).
Conducting post-project reviews and documenting lessons learned.
Contents and format of the final project report.
Archiving project documentation and knowledge transfer.
Handover processes to operations or subsequent project phases.
Ensuring stakeholder acceptance and satisfaction.
Differentiating projects, programs, and portfolios.
Strategic alignment of programs and portfolios with organizational objectives.
Techniques for prioritization and resource allocation across projects.
Coordination and dependencies management.
Roles and responsibilities of project stakeholders.
Governance structures (project steering committee, project management office).
Linking projects to organizational strategy and business objectives.
Strategic project selection and portfolio management.
Cultural considerations and global project teams.
Cross-border regulations and logistics.
Industry-specific challenges and regulations (IT, construction, healthcare).
Tailoring project management approaches to sector-specific requirements.
Features and functionalities of tools like Microsoft Project, Jira, Trello.
Integration with other project management and collaboration tools.
Analytical methods (SWOT analysis, decision trees, cost-benefit analysis).
Techniques for generating and evaluating alternatives.
Simulation tools (Monte Carlo simulation).
Root cause analysis and trend analysis techniques.
Mapping stakeholder expectations and influence.
Techniques for fostering positive stakeholder relationships.
Facilitation skills and techniques for consensus-building.
Tools for brainstorming, prioritization, and decision-making.
Motivating teams and fostering collaboration.
Delegating tasks and empowering team members.
Effective verbal and written communication.
Active listening and feedback techniques.
Strategies for negotiating project terms and resolving conflicts.
Handling difficult conversations and managing emotions.
Prioritization techniques and time-blocking strategies.
Managing interruptions and maintaining focus.
Analytical thinking and problem-solving approaches.
Evaluating alternatives and making informed decisions.
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 30 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- Answered
- Review
-
Question 1 of 30
1. Question
John is managing a software development project. During the risk identification phase, his team identifies a potential risk that the new software might not be compatible with the existing system architecture. What should John do to manage this risk?
Correct
Developing a contingency plan is a key part of risk management. It prepares the team for potential issues without halting the project. According to PMBOK guidelines, contingency planning is essential for managing identified risks effectively.
Incorrect
Developing a contingency plan is a key part of risk management. It prepares the team for potential issues without halting the project. According to PMBOK guidelines, contingency planning is essential for managing identified risks effectively.
-
Question 2 of 30
2. Question
Sarah is leading a construction project and needs to set quality standards for the materials used. What should be her first step in quality planning?
Correct
Quality planning involves understanding the required standards and regulations to ensure the project meets the necessary quality criteria. According to ISO 9001, reviewing industry standards is crucial for setting relevant quality benchmarks.
Incorrect
Quality planning involves understanding the required standards and regulations to ensure the project meets the necessary quality criteria. According to ISO 9001, reviewing industry standards is crucial for setting relevant quality benchmarks.
-
Question 3 of 30
3. Question
Michael is managing a marketing campaign and needs to ensure effective communication with all stakeholders. What is the best approach for Michael to take?
Correct
A communication plan ensures that the right information is distributed to the right people at the right time. According to the PMBOK Guide, effective communication planning is critical for stakeholder engagement and project success.
Incorrect
A communication plan ensures that the right information is distributed to the right people at the right time. According to the PMBOK Guide, effective communication planning is critical for stakeholder engagement and project success.
-
Question 4 of 30
4. Question
Emily is leading a project team that is experiencing conflict between two key team members. What should Emily do to resolve the conflict?
Correct
Mediation helps resolve conflicts by addressing the underlying issues through open communication. According to Tuckman’s stages of group development, conflict resolution is crucial for team performance and cohesion.
Incorrect
Mediation helps resolve conflicts by addressing the underlying issues through open communication. According to Tuckman’s stages of group development, conflict resolution is crucial for team performance and cohesion.
-
Question 5 of 30
5. Question
Alex is directing a project that is falling behind schedule. What should Alex do to get the project back on track?
Correct
Reallocating resources and adjusting the schedule can help optimize project performance without altering the scope or budget. According to PMBOK, effective project management involves continuous monitoring and adjusting project plans.
Incorrect
Reallocating resources and adjusting the schedule can help optimize project performance without altering the scope or budget. According to PMBOK, effective project management involves continuous monitoring and adjusting project plans.
-
Question 6 of 30
6. Question
Jessica is implementing quality assurance processes in her project. What is the primary goal of these processes?
Correct
Quality assurance focuses on process improvements and adherence to quality standards during the project lifecycle. According to ISO 9001, quality assurance aims to enhance customer satisfaction by ensuring consistent quality.
Incorrect
Quality assurance focuses on process improvements and adherence to quality standards during the project lifecycle. According to ISO 9001, quality assurance aims to enhance customer satisfaction by ensuring consistent quality.
-
Question 7 of 30
7. Question
David is conducting procurements for a large infrastructure project. What should be his primary focus during the procurement planning phase?
Correct
Clear procurement requirements and criteria ensure that the right vendors are selected and the project’s needs are met. According to the PMBOK Guide, effective procurement planning is essential for successful project execution.
Incorrect
Clear procurement requirements and criteria ensure that the right vendors are selected and the project’s needs are met. According to the PMBOK Guide, effective procurement planning is essential for successful project execution.
-
Question 8 of 30
8. Question
Rachel is tracking her project’s performance using Key Performance Indicators (KPIs). What is the primary purpose of using KPIs in project management?
Correct
KPIs provide measurable values that help track project performance against objectives, allowing for timely adjustments. According to the PMBOK Guide, performance measurement is crucial for effective project management.
Incorrect
KPIs provide measurable values that help track project performance against objectives, allowing for timely adjustments. According to the PMBOK Guide, performance measurement is crucial for effective project management.
-
Question 9 of 30
9. Question
Carlos is using Earned Value Management (EVM) to assess project performance. If the Cost Performance Index (CPI) is less than 1, what does this indicate about the project’s financial performance?
Correct
A CPI less than 1 indicates that the project is spending more than planned, hence it is over budget. EVM is a key project management tool for assessing project health in terms of cost and schedule.
Incorrect
A CPI less than 1 indicates that the project is spending more than planned, hence it is over budget. EVM is a key project management tool for assessing project health in terms of cost and schedule.
-
Question 10 of 30
10. Question
Liam is working on a community development project and needs to engage various stakeholders. What is the best strategy for stakeholder engagement?
Correct
A stakeholder engagement plan ensures continuous communication and involvement, which is critical for project success. According to PMBOK, engaging stakeholders effectively helps in managing their expectations and gaining their support.
Incorrect
A stakeholder engagement plan ensures continuous communication and involvement, which is critical for project success. According to PMBOK, engaging stakeholders effectively helps in managing their expectations and gaining their support.
-
Question 11 of 30
11. Question
Sarah is managing a software development project. Halfway through the project, she realizes that the project is significantly behind schedule. What should Sarah do first to address the schedule variance?
Correct
According to PMBOK guidelines, understanding the root cause of any variance is critical before taking corrective actions. Performing a root cause analysis helps to identify the underlying issues causing the delay, which can then be addressed appropriately. Adding more resources or requesting a deadline extension should be considered after understanding the cause of the delay【PMBOK Guide】.
Incorrect
According to PMBOK guidelines, understanding the root cause of any variance is critical before taking corrective actions. Performing a root cause analysis helps to identify the underlying issues causing the delay, which can then be addressed appropriately. Adding more resources or requesting a deadline extension should be considered after understanding the cause of the delay【PMBOK Guide】.
-
Question 12 of 30
12. Question
During a project to construct a new office building, Raj realizes that the project is exceeding its budget. Which action should Raj take to control the budget?
Correct
Earned Value Management (EVM) is a project management technique for measuring project performance and progress in an objective manner. It combines measurements of scope, schedule, and cost in a single integrated system. By using EVM, Raj can get a better understanding of the project’s current performance and predict future trends, allowing for more informed decisions【PMBOK Guide, Earned Value Management】.
Incorrect
Earned Value Management (EVM) is a project management technique for measuring project performance and progress in an objective manner. It combines measurements of scope, schedule, and cost in a single integrated system. By using EVM, Raj can get a better understanding of the project’s current performance and predict future trends, allowing for more informed decisions【PMBOK Guide, Earned Value Management】.
-
Question 13 of 30
13. Question
Maria is responsible for ensuring that the new product meets the company’s quality standards. During testing, she finds that the product consistently fails to meet the required specifications. What should Maria do?
Correct
A quality audit is an essential tool in quality management that helps identify areas of improvement. By conducting a quality audit, Maria can determine the root cause of the quality issues and implement corrective actions to ensure that the product meets the required standards【ISO 9001:2015 Quality Management Systems】.
Incorrect
A quality audit is an essential tool in quality management that helps identify areas of improvement. By conducting a quality audit, Maria can determine the root cause of the quality issues and implement corrective actions to ensure that the product meets the required standards【ISO 9001:2015 Quality Management Systems】.
-
Question 14 of 30
14. Question
During the implementation of a marketing campaign, Tom identifies a new risk that could significantly impact the project. What should Tom do next?
Correct
Proper risk management involves continuously monitoring risks and updating the risk register as new risks are identified. By doing so, Tom can ensure that appropriate risk response plans are in place, thereby mitigating potential negative impacts on the project【PMBOK Guide, Risk Management】.
Incorrect
Proper risk management involves continuously monitoring risks and updating the risk register as new risks are identified. By doing so, Tom can ensure that appropriate risk response plans are in place, thereby mitigating potential negative impacts on the project【PMBOK Guide, Risk Management】.
-
Question 15 of 30
15. Question
Jane is overseeing a project when a key stakeholder requests a significant change to the project scope. What should Jane do first?
Correct
Change control processes involve assessing the impact of any proposed change on the project’s scope, schedule, and cost before implementation. This ensures that any changes are managed effectively without adversely affecting the project objectives【PMBOK Guide, Change Control Process】.
Incorrect
Change control processes involve assessing the impact of any proposed change on the project’s scope, schedule, and cost before implementation. This ensures that any changes are managed effectively without adversely affecting the project objectives【PMBOK Guide, Change Control Process】.
-
Question 16 of 30
16. Question
Paul is leading a project and receives feedback from stakeholders that they feel left out of the decision-making process. How should Paul address this concern?
Correct
Effective stakeholder engagement is crucial for project success. By increasing the frequency of meetings and improving communication, Paul can ensure that stakeholders feel involved and informed, which can lead to better support and fewer conflicts【PMBOK Guide, Stakeholder Management】.
Incorrect
Effective stakeholder engagement is crucial for project success. By increasing the frequency of meetings and improving communication, Paul can ensure that stakeholders feel involved and informed, which can lead to better support and fewer conflicts【PMBOK Guide, Stakeholder Management】.
-
Question 17 of 30
17. Question
Emily is closing a project phase and needs to ensure all activities are completed. What is the most appropriate action she should take?
Correct
Conducting a phase-end review is a key step in project management. It ensures that all deliverables and activities are completed and meet the project requirements before moving on to the next phase【PMBOK Guide, Project Closeout】.
Incorrect
Conducting a phase-end review is a key step in project management. It ensures that all deliverables and activities are completed and meet the project requirements before moving on to the next phase【PMBOK Guide, Project Closeout】.
-
Question 18 of 30
18. Question
During the administrative closure of a project, Leah needs to ensure that all documentation is properly completed and archived. Which of the following actions should she prioritize?
Correct
Administrative closure involves finalizing all project documents and archiving them according to organizational policies. This ensures that there is a complete record of the project for future reference and compliance purposes【PMBOK Guide, Administrative Closure】.
Incorrect
Administrative closure involves finalizing all project documents and archiving them according to organizational policies. This ensures that there is a complete record of the project for future reference and compliance purposes【PMBOK Guide, Administrative Closure】.
-
Question 19 of 30
19. Question
After completing a project, Andrew wants to conduct a post-project evaluation. What is the primary purpose of this evaluation?
Correct
Post-project evaluations are conducted to identify and document lessons learned. This helps improve processes and practices for future projects by learning from past experiences【PMBOK Guide, Lessons Learned】.
Incorrect
Post-project evaluations are conducted to identify and document lessons learned. This helps improve processes and practices for future projects by learning from past experiences【PMBOK Guide, Lessons Learned】.
-
Question 20 of 30
20. Question
At the end of a project, Lisa is responsible for creating the final project report. What key information should this report include?
Correct
A summary of project performance, including achievements and challenges.
Explanation: The final project report should include a summary of the project’s performance, highlighting both achievements and challenges. This comprehensive overview provides valuable insights for stakeholders and helps in future project planning【PMBOK Guide, Project Reporting】.Incorrect
A summary of project performance, including achievements and challenges.
Explanation: The final project report should include a summary of the project’s performance, highlighting both achievements and challenges. This comprehensive overview provides valuable insights for stakeholders and helps in future project planning【PMBOK Guide, Project Reporting】. -
Question 21 of 30
21. Question
Mr. Johnson is managing a project to develop a new software system for a multinational corporation. The project involves team members from different countries with diverse cultural backgrounds. Recently, he noticed that the team is facing communication issues and misunderstandings due to these cultural differences. What should Mr. Johnson do to improve team collaboration and ensure the project stays on track?
Correct
Cultural sensitivity training helps team members understand and respect each other’s cultural backgrounds, improving communication and collaboration. Encouraging open communication fosters a supportive environment where team members feel comfortable sharing their ideas and concerns. This approach aligns with best practices in international project management and managing global teams, as outlined in the PMI’s PMBOK® Guide and ISO 21500:2012.
Incorrect
Cultural sensitivity training helps team members understand and respect each other’s cultural backgrounds, improving communication and collaboration. Encouraging open communication fosters a supportive environment where team members feel comfortable sharing their ideas and concerns. This approach aligns with best practices in international project management and managing global teams, as outlined in the PMI’s PMBOK® Guide and ISO 21500:2012.
-
Question 22 of 30
22. Question
In a multi-project management environment, what is the primary benefit of having a centralized Project Management Office (PMO)?
Correct
A centralized PMO standardizes project management processes, improves resource allocation, and enhances overall project governance. This leads to better coordination, reduced redundancy, and more efficient use of resources, as per guidelines in PMI’s Organizational Project Management Maturity Model (OPM3) and ISO 21500:2012.
Incorrect
A centralized PMO standardizes project management processes, improves resource allocation, and enhances overall project governance. This leads to better coordination, reduced redundancy, and more efficient use of resources, as per guidelines in PMI’s Organizational Project Management Maturity Model (OPM3) and ISO 21500:2012.
-
Question 23 of 30
23. Question
Sarah is a project manager for a healthcare IT project. During the risk assessment phase, her team identified a high probability of data security breaches that could severely impact patient confidentiality. What should Sarah do to mitigate this risk?
Correct
Mitigating risks involves taking proactive steps to reduce the likelihood or impact of potential issues. Implementing stringent data security measures and conducting regular audits align with best practices in risk management, as recommended by NIST’s Risk Management Framework (RMF) and the PMBOK® Guide.
Incorrect
Mitigating risks involves taking proactive steps to reduce the likelihood or impact of potential issues. Implementing stringent data security measures and conducting regular audits align with best practices in risk management, as recommended by NIST’s Risk Management Framework (RMF) and the PMBOK® Guide.
-
Question 24 of 30
24. Question
Which project management tool is best suited for visualizing project tasks and dependencies in a timeline format?
Correct
MS Project is designed specifically for project management and offers powerful features for creating Gantt charts, which visualize project tasks and dependencies in a timeline format. This helps in effective project planning and tracking, as highlighted in project management software guidelines.
Incorrect
MS Project is designed specifically for project management and offers powerful features for creating Gantt charts, which visualize project tasks and dependencies in a timeline format. This helps in effective project planning and tracking, as highlighted in project management software guidelines.
-
Question 25 of 30
25. Question
David is managing a construction project and is in the process of transitioning project deliverables to the operations team. He needs to ensure that the operations team can maintain and operate the new facility effectively. What should David do to facilitate this transition?
Correct
Organizing training sessions and providing ongoing support ensures that the operations team is well-prepared to manage the new facility, reducing the risk of operational issues. This aligns with best practices in transitioning project deliverables, as outlined in the PMBOK® Guide and ISO 21500:2012.
Incorrect
Organizing training sessions and providing ongoing support ensures that the operations team is well-prepared to manage the new facility, reducing the risk of operational issues. This aligns with best practices in transitioning project deliverables, as outlined in the PMBOK® Guide and ISO 21500:2012.
-
Question 26 of 30
26. Question
What is a key aspect of aligning projects with organizational goals?
Correct
Aligning projects with organizational goals involves prioritizing projects that support the strategic objectives of the organization. This ensures that resources are allocated to initiatives that drive the organization forward, as recommended by the PMI’s Strategic Alignment Model and ISO 21500:2012.
Incorrect
Aligning projects with organizational goals involves prioritizing projects that support the strategic objectives of the organization. This ensures that resources are allocated to initiatives that drive the organization forward, as recommended by the PMI’s Strategic Alignment Model and ISO 21500:2012.
-
Question 27 of 30
27. Question
Emily is leading a project to implement a new ERP system in a manufacturing company. She faces resistance from employees who are comfortable with the old system. What should Emily do to address this resistance and ensure successful implementation?
Correct
Effective change management involves preparing and supporting employees through the transition. Conducting workshops and providing training helps employees understand the benefits of the new system and how to use it effectively, aligning with best practices in change management from Kotter’s 8-Step Change Model and the PMBOK® Guide.
Incorrect
Effective change management involves preparing and supporting employees through the transition. Conducting workshops and providing training helps employees understand the benefits of the new system and how to use it effectively, aligning with best practices in change management from Kotter’s 8-Step Change Model and the PMBOK® Guide.
-
Question 28 of 30
28. Question
Which technique is commonly used for effective problem-solving in project management?
Correct
SWOT Analysis (Strengths, Weaknesses, Opportunities, Threats) is a strategic planning tool used to identify internal and external factors that can impact the success of a project. It helps in effective problem-solving by providing a comprehensive view of potential issues and opportunities, as outlined in strategic management guidelines.
Incorrect
SWOT Analysis (Strengths, Weaknesses, Opportunities, Threats) is a strategic planning tool used to identify internal and external factors that can impact the success of a project. It helps in effective problem-solving by providing a comprehensive view of potential issues and opportunities, as outlined in strategic management guidelines.
-
Question 29 of 30
29. Question
Michael is managing a project portfolio for a large corporation. He needs to ensure that all projects within the portfolio are aligned and contribute to the strategic goals of the organization. What should Michael do?
Correct
A governance framework ensures that all projects are consistently aligned with the strategic goals of the organization. Regular reviews and alignment checks help in maintaining this alignment, as recommended by PMI’s Governance of Portfolios, Programs, and Projects (The Standard for Portfolio Management) and ISO 21500:2012.
Incorrect
A governance framework ensures that all projects are consistently aligned with the strategic goals of the organization. Regular reviews and alignment checks help in maintaining this alignment, as recommended by PMI’s Governance of Portfolios, Programs, and Projects (The Standard for Portfolio Management) and ISO 21500:2012.
-
Question 30 of 30
30. Question
What is the primary purpose of using analytical tools for risk and performance analysis in project management?
Correct
Analytical tools help project managers identify potential risks, develop mitigation strategies, and monitor project performance to ensure that the project stays on track. This approach aligns with best practices in risk management and performance analysis, as outlined in the PMBOK® Guide and ISO 31000:2018.
Incorrect
Analytical tools help project managers identify potential risks, develop mitigation strategies, and monitor project performance to ensure that the project stays on track. This approach aligns with best practices in risk management and performance analysis, as outlined in the PMBOK® Guide and ISO 31000:2018.